Custom Metal Hardware Durable Door Panel Parts Suspension System Parts Body Panel Part Golf Cart Parts

Still deciding? Get samples of $ !
Order Sample

Product Description

Product Overview & Basic Information
Model NO.
Metal Parts-008
Condition
New
Certification
CE, RoHS, GS, ISO9001
Standard
DIN, ASTM, GOST, GB, JIS, ANSI, BS
Material
Metal
Machining Method
CNC Machining
Accuracy
0.005mm
Production Type
Batch Production
Custom Metal Hardware
Custom Metal Hardware & Golf Cart Parts
Detailed Specifications & Services
Business Type CNC Milling (3/4/5-axis), CNC Turning, Drilling, Grinding, EDM, Sheet Metal Fabrication (Stamping, Welding, Bending, Laser Cutting)
Materials Stainless Steel (304, 316, 2205), Carbon Steel (Q235, 1045), Brass (C360, H62), Aluminum (6061-T6, 7075-T6), Titanium, Plastics (ABS, PEEK, POM)
Surface Treatment Polishing, Sandblasting, Anodizing, Black Oxidation, Electroplating, Powder Coating, Passivation, Heat Treatment
Accuracy Range Machining: +/-0.005mm | Grinding: +/-0.005mm | Roughness: Ra0.8 | Concentricity: 0.003mm
QC System 100% Inspection before shipment using CMM, Projector, Hardness Tester, and Roughness Tester
Machining Capabilities
Material & Product Gallery
Production Process & QC Standards
Professional CNC customized parts supplier since 2009.
Equipped with 30 imported precision machine tools (3, 4, and 5-axis).
Fully equipped inspection department with spectrometers and CMM.
Strict root cause analysis of non-conformances and continuous improvement.
Certifications: ISO 9001:2015, AS9100D, IATF 16949:2016.
Packaging & Global Shipping
Certifications
Frequently Asked Questions
Q: Are you a trading company or manufacturer?
A: We own our factory with experienced engineers and employees as well as a well-organized workshop.
Q: Do you provide samples and what is the cost?
A: Yes, samples are provided. The sample fee depends on the product geometry and will be returned upon placing a bulk order.
Q: What is the lead time for samples and mass production?
A: Samples typically take 3-7 days. Mass production orders take 7-15 days depending on quantity and part complexity.
Q: What are your terms of payment?
A: Our standard terms are 50% advance prepaid, with the remaining 50% balance paid before shipment.
Q: Which materials can you process for custom parts?
A: We support a wide range of materials including Aluminum, Stainless Steel, Carbon Steel, Brass, Copper Alloy, Titanium, and various Plastics like PEEK and ABS.
Q: How do you ensure the quality of high-precision parts?
A: We perform 100% inspection before shipment using advanced equipment like CMM and spectrometers, adhering to ISO 9001 and IATF 16949 standards.

Related Products